Case Study: Packaging Line Throughput +35%
2026-03-01 · Sigelang Project Office
Situation
A beverage exporter faced line stoppages during peak shifts due to carton variance and uneven infeed.
Actions
- Added dynamic buffering before the sealing station
- Re-tuned servo sealing parameters for mixed carton batches
- Standardized changeover SOP with timing targets
Outcome
Average throughput increased ~35% with fewer jams and more predictable handover to palletizing.